Committente
Municipality of Benna (BI)
Anno
1999 – 1st lot
2001-2003 – 2nd lot
2006-2009 – 3rd lot
2006-2011 – 4th lot
2009 – in progress – 5th lot
Importo lavori
€ 9.366.601,52 (total amount)
- Hydraulic engineering works on Rio Ottina – 2nd lot – Final design and works management.
- Hydraulic engineering works on Rio Ottina – 3rd lot – Preliminary project and final design, eco-audit and works management.
- Hydraulic engineering works on Rio Ottina – 4th lot – Preliminary project and final design, eco-audit and works management.
- Adjustment to the drainage channel of the territory in the municipalities of Benna, Buronzo, Gaglianico, Massazza, Sandigliano, Verrone, Villanova Biellese. Preliminary project, final design and works management – 2nd section.
- Agreement among the municipalities of: Benna, Buronzo, Candelo, Gaglianico, Massazza, Sandigliano, Verrone and Villanova Biellese (Provinces of Biella and Vercelli).
- Hydraulic engineering works on Rio Ottina. Preliminary project, final design and W.M. – 1st section.
Agreement among the municipalities of: Benna, Buronzo, Candelo, Gaglianico, Massazza, Sandigliano, Verrone and Villanova Biellese (Provinces of Biella and Vercelli). - Hydrogeological study and planning of hydraulic engineering
- Study of feasibility: overflow channel on Bazzella river.
- Overflow channel on Bazzella river. Final design and works management.
- Study of feasibility: flood control basin of Rio Ledda and Rio Rialone.