Benna (BI) – Rio Ottina – 5 lots

Committente

Municipality of Benna (BI)

Anno

1999 – 1st lot
2001-2003 – 2nd lot
2006-2009 – 3rd lot
2006-2011 – 4th lot
2009 – in progress – 5th lot

Importo lavori

€ 9.366.601,52 (total amount)

  • Hydraulic engineering works on Rio Ottina – 2nd lot – Final design and works management.
  • Hydraulic engineering works on Rio Ottina – 3rd lot – Preliminary project and final design, eco-audit and works management.
  • Hydraulic engineering works on Rio Ottina – 4th lot – Preliminary project  and final design, eco-audit and works management.
  • Adjustment to the drainage channel of the territory in the municipalities of Benna, Buronzo, Gaglianico, Massazza, Sandigliano, Verrone, Villanova Biellese. Preliminary project, final design and works management – 2nd section.
  • Agreement among the municipalities of: Benna, Buronzo, Candelo, Gaglianico, Massazza, Sandigliano, Verrone and Villanova Biellese (Provinces of Biella and Vercelli).
  • Hydraulic engineering works on Rio Ottina. Preliminary project, final design and W.M. – 1st section.
    Agreement among the municipalities of: Benna, Buronzo, Candelo, Gaglianico, Massazza, Sandigliano, Verrone and Villanova Biellese (Provinces of Biella and Vercelli).
  • Hydrogeological study and planning of hydraulic engineering
  • Study of feasibility: overflow channel on Bazzella river.
  • Overflow channel on Bazzella river. Final design and works management.
  • Study of feasibility: flood control basin of Rio Ledda and Rio Rialone.