Castellamonte (TO) – Development of the Ponterosso plant
Client Energy Power Technology SRL – Varallo (VC) Year 2007 Work amount: € 1.600.000,00 Renewal and development of the Ponterosso plant on the Caluso channel in Castellamonte (TO). Gallery
Client Energy Power Technology SRL – Varallo (VC) Year 2007 Work amount: € 1.600.000,00 Renewal and development of the Ponterosso plant on the Caluso channel in Castellamonte (TO). Gallery
Client CMC – Cooperativa Muratori & Cementisti (RA) – Italy Year 2011-2012 Work amount: € 17.500.000,00 Bidding design “Study of execution, realization and management of the wastewater treatment plant of the city of Oum El Bouaghi (W.Oum El Bouaghi)” (Algeria) – P.E. 145.000 Download Gallery
Client UNIECO Società Cooperativa, CMB – Cooperativa Muratori & Braccianti Di Carpi (MO), CMC – Cooperativa Muratori & Cementisti (RA) – Italy Year 2012 Work amount: € 40.000.000,00 Bidding design “Study of execution, realization and management of the wastewater treatment plant of the city of Mostaganem” (Algeria) – P.E. 350.000 Download Gallery
Client HERA SPA – Forlì Cesena (committente privato) Year 2008 (2010) Work amount: € 7.000.000,00 Wastewater treatment plant refitting (Cesenatico – Forlì Cesena) – P.E. 120.000 Preliminary and execution plan. Download Gallery
Client Società Italiana per Condotte d’Acqua Year 2011 Work amount: € 20.000.000,00 Bidding design “Study of execution, realization and management of the wastewater treatment plant of the city of Ain M’Lila (W.Oum El Bouaghi)” (Algeria) – P.E. 163.000 Download Gallery
Client SIPEA SRL – Borgosesia (VC) Year 2007-2010 Work amount: € 4.740.000,00 Movement of the hydroelectric power plant “Centro” from the “Filatura di Grignasco” to the new building plant in the territory of “Prati di Baragiotta”. Preliminary and execution plan. Download Gallery
Client SIN & VE S.r.l. Year 2007 Work amount: € 2.719.651,72 Completion works of Wastewater treatment plant in Via Generali, 91 in Novara. Final design. Download Gallery
Client Società Italiana per Condotte d’acqua S.p.A. Year 2007-2008 Work amount: € 71.000.000,00 Building of the drinking water feeding system in several inland cities, starting from the desalination plant placed in the city of Skikda (Algeria). Final design. Download Gallery