Sandigliano (BI) – Hydraulic engineering works

Client

Municipality of Sandigliano (BI)

Year

1998-2009

Work amount:

€ 5.724.663,50

  • Hydraulic engineering works on Rio Moglie – Preliminary project.
  • Hydraulic engineering works on Rio Moglie – Preliminary project, final design and works management.
  • Hydraulic engineering works on Rio Moglie – Preliminary project, final design and works management.
  • Renewal of sewers and roads – Preliminary project, final design and works management. – Overflow channel – final design and works management.
  • Study of feasibility: East overflow channel